Memo
To: BP Project Manager
From: Jamal Mills
CC: Jennifer Ogo
Date: November 19, 2013
Subject: Seismic Exploration Results and Findings
The method we used to determine where to put the drill was based on the readings of the seismograph that measured the sound waves. I propose that you should drill in zone C1 because it has the lowest number. The depth required to reach the oil is approximately1500m, to reach this depth you will have to drill through densities ranging from 1750-2800kg.
From: Jamal Mills
CC: Jennifer Ogo
Date: November 19, 2013
Subject: Seismic Exploration Results and Findings
The method we used to determine where to put the drill was based on the readings of the seismograph that measured the sound waves. I propose that you should drill in zone C1 because it has the lowest number. The depth required to reach the oil is approximately1500m, to reach this depth you will have to drill through densities ranging from 1750-2800kg.